Temporary hot water
Mobile sinks: turn washes-per-fill claims into a refill and waste plan
Compare the actual wash cycle and both reservoirs, then assign replenishment and interruptions for the busiest period.
A quoted wash is not automatically a person served
Ask what the supplier means by “wash”: one timed activation, a full handwashing sequence or a measured volume. Check whether the count includes startup purging, additional rinses, cold-water use and the usable rather than nominal reservoir volume. Do not compare two headline counts unless their cycle and operating assumptions match.
The BigSynk manual says its 20-litre fresh supply provides “up to 120 washes” per filling. It separately describes a warm-water activation with a 3–5-second delay and a 10-second warm spray, while its cold-water function operates differently. Repeated activations and cold use can change how long the water lasts. Keep “up to” and the model identity: do not convert the claim into 120 people served or an unattended whole-event guarantee.[1]
The Handeman Xtra 230V uses a different arrangement: a 3.3-litre supply and a removable bowl retaining the waste. It also has a warm-up period. Do not copy another station’s two-container handling plan or wash count onto it.[2]
Worked operating interval
Use a site-specific measured complete-use volume, not an invented standard wash allowance. Suppose, purely for planning, usable clean water after reserve is 18 litres, usable waste capacity is 12 litres and a measured complete use consumes 0.30 litres. The clean side allows 60 uses but the waste side only 40; the smaller limit governs. At a busy rate of 80 uses/hour, that is 30 minutes before the limiting volume is reached.
If consumption instead measures 0.50 litres, the same 18 litres of usable clean water allows only 36 uses before considering the waste limit. Recalculate rather than preserving a convenient wash-count claim. Plan an earlier service trigger and allow time for walking, safe handling, refilling, disposal, cleaning and any return-to-temperature delay. These figures are illustrative, not capacities or performance attributed to either named product.
Assign a log and a backup
The BigSynk instructions require space to remove both containers and direct wastewater disposal to a foul drain. They also require cleaning and fresh-water management; follow the correct model’s supplied instructions rather than making a generic chemical recipe.[1] Food operations need their authority-agreed water and waste plan as well.[3]
- Log date/time, unit ID, operator, clean-water level, waste level and approximate uses since service.
- Record refill source, disposal point, cleaning action and time back in service.
- Name the person covering each peak and the person covering their break.
- Check the waste side whenever refilling; never assume it can accept another tankful.
- If servicing cannot happen before the limiting interval, add an assessed backup or change the operating plan before opening.
Sources and scope
- [1] TEAL BigSynk 230V operating manual
Manufacturer manual BS230 8_2021 retrieved 26 November 2026. Self-contained 20-litre fresh supply, separate waste, up-to-120 claim, wash cycle, electrical specification and handwashing-only/non-drinking restrictions.
- [2] TEAL Handeman Xtra 230V operating manual
Manufacturer manual HMX 230v 12_2023 retrieved 26 November 2026; 3.3-litre capacity, retained waste bowl, approximate warm-up and handwashing-only/non-drinking limits.
- [3] Bradford Council: setting up a mobile food business
England local-authority guidance retrieved 26 November 2026; separate hand/equipment washing, hot/cold provision, drinking-quality supply and sealed wastewater collection to foul drainage. Confirm the actual operation with its local authority.