Cylinders and hot-water heat pumps
Will a larger store recover before the next busy period?
Build a between-peak timeline, distinguish partial recovery from full heat-up, and stop cost comparisons when source units are unclear.
Put both peaks on one timeline
Record when the store reaches its agreed starting state, the first peak’s withdrawals, any intervening use and the deadline for the second peak. “There is an hour between shifts” is incomplete if cleaning occupies most of that hour. Note whether the controls actually allow heating throughout the gap.
An ideal direct-electric calculation makes a useful rejection check: heating 50 litres from 10°C to 60°C takes approximately 2.91 kWh, using 0.001163 kWh per litre per degree. At 3 kW this is about 58 minutes before heat losses or control effects. A 30-minute gap cannot restore that full quantity under these assumptions. The 50 litres here is water heated through the full rise, not automatically 50 litres of mixed water used at a tap.
Do not rename a partial-recovery test
The historical Multipoint SS V table gives the 80-litre 3.0 kW model 81 minutes for heat-up and 56 minutes for recovery. Its notes define heat-up as a 45°C rise starting at 20°C, and recovery as heating 70% of capacity through 45°C. Neither row is a universal promise to restore an emptied cylinder in that time.[1]
Keep voltage and mode with the figures: that manual separately rates the element 3.0 kW at 240 V and 2.8 kW at 230 V. Do not silently use the higher power for every site.[1]
For an indirect cylinder, obtain recovery evidence for the selected heat source, coil, primary temperatures, flow and controls. An integrated heat-pump water heater has its own heat-pump/boost modes and test conditions: the Edel sheet separately gives heat-pump-only and combined outputs. Do not substitute electrical input, a maximum thermal rating or a space-heating nameplate into the electric-element calculation.[2]
An unclear loss unit means no running-cost result
The retrieved Powerflow document is named Powerflow-LS-Instructions-v25.9.2.pdf but its cover says V25.8.1. Its table literally heads a row “Standing heat loss kW/24h”. Preserve both facts and ask Hyco to confirm the intended quantity, unit, model and test temperatures. Do not silently change the heading to kWh/day, multiply it by a tariff and publish a cost.[3]
- Ask for the exact model’s full/partial reheat definition and starting condition.
- Subtract all intervening demand from the recovery opportunity.
- Request a manufacturer duty assessment if the second peak has little margin.
- Keep any cost output unavailable until the loss quantity and units are confirmed; a plausible number is not clarification.
Sources and scope
- [1] Heatrae Sadia Multipoint SS V fitting instructions
Manufacturer manual 36006070 issue 04, ©2015, retrieved 26 November 2026. Historical SS vertical models only; do not transfer performance to Multipoint Eco.
- [2] Dimplex Edel RF specification sheet
Manufacturer sheet retained in project evidence, checked 26 November 2026; exact EDL200UK-630RF and EDL270UK-630RF models, integrated heat pump, ducting and conditioned heat-up data. Not a current-availability statement.
- [3] Hyco Powerflow Smart instruction manual
Manufacturer manual retrieved 26 November 2026; PF30LS–PF100LS specifications, installation space, partial recovery and literal loss heading. Filename v25.9.2; cover V25.8.1: retain the discrepancy.