Hot water for businesses
Office kitchenette hot water: size by tasks, not staff count
Capture handwashing, mug washing and sink fills as separate loads, and keep drinking-water demand out of the washwater calculation.
Observe one real break period
An office with staggered use can have a different hot-water requirement from a smaller office whose break starts together. Record task volume, required temperature, duration, tap location and overlap through a representative busy period. Ask cleaners about their sink fills too; a quiet afternoon total can conceal a substantial single draw.
Keep three columns: handwashing, light washing-up and drinks. An ordinary point-of-use washwater heater is not a substitute for equipment documented for boiling drinking water. Count cups and recovery separately for the drinks system; do not turn a basin-count recommendation into a beverage rating.
Worked task schedule
For an illustrative 15-minute window, suppose measured uses are twelve handwashes at 0.8 litres, six mug-rinsing tasks at 1.5 litres and one 8-litre sink fill. If all are required at the same 40°C comparison temperature, that totals 26.6 litres. This is an assumed schedule, not a recommended washing method or water-temperature standard. If cleaning needs hotter water, record it as a separate temperature load.
Note when the sink fill overlaps handwashing and how much hot water is wasted waiting at each outlet. Then test the selected store’s documented mixed-water capacity and recovery against this sequence. Do not compare 26.6 litres of mixed water directly with a tank’s nominal litres.
Use application evidence without stretching it
Hyco describes Speedflow for light kitchen dishwashing and cloakroom handwashing, but calls its basin selection guide approximate and dependent on use. Its SF10K and SF10K12 both hold 10 litres yet have different element ratings: 2.0 and 1.2 kW. The published 12- and 20-minute heat-up figures are expressly minimum theoretical times for 70% of capacity from 10°C to 60°C—not full-store replenishment promises.[1]
- Give the installer the peak schedule and the next scheduled draw, not just staff headcount.
- Confirm tap compatibility, simultaneous supply, distribution distance, expansion/discharge arrangements and access.
- If the schedule exceeds the documented small-store duty, request a larger-store or alternative-family assessment.
- Keep boiling drinks, equipment sanitation and any food-business requirements on their own documented application routes.
Sources and scope
- [1] Hyco Speedflow manufacturer specification
Retrieved 26 November 2026; light dishwashing/handwashing application, explicit salon hairwash exclusion, 1.2/2.0 kW variants and the 70%-capacity theoretical heat-up footnote.